What documents are required for a planning application?

What documents are required for a planning application?

What Does a Planning Application Include?

  • five copies of application forms.
  • the signed ownership certificate.
  • a site plan, block plan, elevations of both the existing and proposed sites,
  • a Design and Access Statement.
  • the correct fee.

What plans are required for a planning application?

Most planning applications need you to submit two plans as supporting documents: a location plan, which shows the site and the surrounding area, and a site plan, which shows the proposed development in detail. You can buy both online from one of the Planning Portal's accredited suppliers, listed here.

What happens if you lie on a planning application?

If a planning permission is fraudulently obtained no doubt that renders it liable to be revoked. If you have not already done so, you should notify the planning department in writing. You should also find out the names of the councillors on the planning committee and send a copy of the letter to each one.

Can granted planning permission be revoked?

Only the applicant can make an appeal against a granted planning application. ... This means you cannot appeal a planning application decision which you have not submitted yourself.

Can I do my own planning drawings?

You can do your own plans. They don't have to be too fancy for something like a garage, but they do need to have all the important information on them. (Address, name, dimensions, materials etc.)30 มี.ค. 2548

Can I draw my own plans for building regs?

You have to apply for building regs before you start building and you can do one of the following. A building notice can be submitted by your builder but does not involve any working/detailed drawings. ... The other alternative is to have an architectural technician to submit drawings under a full plan application.

Do I need Building Regs for an extension?

If you're planning to extend your home, you will need to comply with the building regulations. This is a legal requirement and, without formal approval and control, your local council could force you open up or re-build sometimes significant aspects of the project. It could even lead to prosecution and unlimited fines.

Do you get a certificate for building regs?

There aren't any building regulations certificates from when we moved in. ... Building regulation requirements do change over the course of the years and with works that were carried out a long time ago, say 20 years, you often find completion certificates were not even issued at that time.

How do I apply for building regs?

Follow these five steps to building regulations approval and getting that all important completion certificate.

  1. Choose a building control surveyor. ...
  2. Submit your building regulations application. ...
  3. Get to work. ...
  4. The building control surveyor visit. ...
  5. Further information.

How much do building regs cost UK?

How much does building regulation approval cost? This can vary according to local authority fee rates and the nature of the work undertaken, but as a rule of thumb most conversion, renovation or extension work will cost around £100 to submit full plans and a further £200-400 for inspections.

How long do building regs take?

five weeks

Can I get building regs after work is done?

Can I obtain retrospective approval for building work carried out without notification? Yes. The Building Regulations allow you to "regularise" unauthorised building work that has begun since 11 November 1985.

What happens after planning permission is granted?

The authority grants/refuses planning permission by sending you a letter notifying you of its decision. Planning permission runs with the land. This means that land or buildings can usually be sold or let with the benefit of planning permission.

Do I need building notice or full plans?

You can apply for building regulations approval from your local authority building control service by giving a building notice. Plans are not required with this process so it's quicker and less detailed than the full plans application.

Do I need Building Control drawings?

Unlike the Full Plans process, detailed drawings are not always required. However, you must submit the following with your application: • Completed Building Notice form. may be requested to ensure compliance with the Building Regulations.